Historically speaking, as a company, Industria Galvanica Dalla Torre Ermanno & Figli S.p.A., has unceasingly engaged in leading-edge work in the field of ecology and in associated problem areas. For example, start-up for the design/planning phase for the process wastewater purification plant dates back to 1968 (eight years before the first Italian water protection law, the “Merli” Act of 1976). The plant’s activities started up in 1970, when production began at the Fontane facility and headquarters.
The table below provides the major guidelines and projects of the company from the 1990’s to the present day
| Guidelines | Ref. | Guidelines | Concrete application | Period | Funding |
| The longest possible service life of process baths | Page 48 3/d | Lengthening the working life of process solutions | Use of working techniques for maximum use of baths | Ongoing | Self-funded |
| Substitution ofv halogenated solvents | Page 47/2 | Substitution of chlorinated solvents | Use of degreasing agents in water solution | Executed in 1993 | Self-funded |
| Rinsing Techniques | Page 48/73/f | Cascade rinsing techniques | Cascade rinses, re-use of wastewater in various phases, sprayers | Ongoing | Self-funded |
| Substitution of hazardous Substances | Page 48/3/a |
Substitution of processes capable of generating hazardous substances | Elimination of CN from Ni-Cr cycle | Executed in 1995 | Self-funded |
| Substitution of processes generating hazardous Substances | Page 483/c |
Substitution of processes capable of generating hazardous substances | Elimination of use of indicated reagent for purification | Completed in 2000 | Self-funded |
| Best Available technology | App. Page 52 | Production techniques Research and Development | Chromeless plating | Started 1996 | Self-funded |
| Best Available technology | App. Page 52 | Production techniques Research and Development | Sorpmet–Project N° BE-97-5093 Contract N°: BRPR-CT98-0786 | 1998-2001 | Project funded by The European Commission (50%) Self-funded 50% |
| Iso 14001 | Certification of TREVISO facility environmental management system | TREVISO facility UNI EN ISO 14001Certificato N°0066°/017/12/2002 ICIMIQNET IT -27916 | Completed 2001-2002 | Self-funded | |
| Iso 14001 | Certification of Fontane di VILLORBA facility environmental management system | Fontane di VILLORBA facility under way | Under way 2003-2004 | Partial funding requested Chamber of Commerce Unindustria TV | |
| Know How project | TECHNICAL QUALIFICATION OF PRODUCT | Study at INFM /Spin Off STAR | Completed in 2002 | Project funded by RegioneVeneto 25% Self-funded 75% | |
| Life cycle assessment | Life cycle assessment, infinite recyclability study | Progetto Consortile Ecometal, infinitely recyclable. Mark. | 2002-2004 | Self-funded | |
| Flexicoat project | Flexible automated processes for PVD coatings in new applications | 2005-2008 | Ecometal | ||
| Enwatech project | Energy saving and/or pollutant emissions reduction work cycle reorganization | Design hypothesis for removal of boron in galvanic cycle waste rinse water Progetto NanoNi = NanoNi project | 2006-2009 | Regione Veneto | |
| NanoNi project | Technology transfer through acquisition of new know how | nickel-based decorative galvanic coating | 2009-2010 | Regione Veneto |
Industria Galvanica Dalla Torre Ermanno & Figli S.p.A. has always been committed to the environment and provision of environmental safeguards. It has constantly invested resources and energy into optimizing its production systems and seeking out improved solutions for ensuring respect of nature and the environment.
The basic principles guiding Industria Galvanica Dalla Torre Ermanno & Figli S.p.A.’s activities are:
/en/galvanic_improvement.php